2015:Chief of Army Corps of Engineers Approves Port Everglades, Fla. Expansion (The Details)

Approved tentative plan for the widening and deepening of port channels and turning basin.
Approved tentative plan for the widening and deepening of port channels and turning basin

The legend shows the details of the plan, which you should study carefully.  Although none of the expansion will be paid for by imposing increased property taxes on Broward County property owners, one should take heed of the amount of mangrove land to be eliminated to accommodate Port expansion in the light blue rectangle to the west (left). Under federal law, the Port must acquire an equivalent amount of mangrove lands  to mitigate the destruction of environmentally sensitive lands.

Under the plan, the Outer Entrance Channel will be lengthened and widened.  The box in purple called the Widener will increase the size of the turning basin for longer ships required worldwide by the Panama Canal expansion for some of the longest, widest, and heaviest cargo vessels in the World.the forest green box indicating the Inner Entrance Channels will be widened and deepened for traffic flowing to and  from the south for loading or offloading.

The last two boxes in light green are increase space for Notches for Turning and Berthing or just Turning.  The remainder of the colored boxes and lines are as described.  Study them carefully. The Plan represents a the Port’s future, a major enterprise operated by Broward County, Florida.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.