The first dredge used in constructing the Intracoastal Waterway was a crude steel bucket dredge. Each bucket was the size of two average-sized men standing inside. The buckets were attached to a continuous steel chain, powered by steam. First used in the so-called Matanzas-Halifax Cut, the dredge was to join the Matanzas River at St. Augustine with the Halifax River at Ormond (now, Ormond Beach). The thirty-mile stretch of dry land required thirty years to complete the work. The constant breaking of the continuous chain as well as the tearing away of buckets from the chain made the work difficult to sustain.
In the dredging of dry cuts like this one, it was necessary to put fifty to eighty men with shovels and picks ahead of the bucket dredge to break up the solid ground and remove any sizeable trees. Often, expediency required a source of water ahead of the the work to make the rock and sand more easily removed by the buckets without sand and rock escaping the buckets.
It didn’t take canal company officials long to realize that more efficient machines were needed. The dredge machine was all encompassing. It contained not only the dredge itself but also sleeping quarters for the men operating the machine, a kitchen and dining area, as well as an acetylene gas generator for lighting, for dredging twenty-four hours a day.